演讲稿英语演讲稿

WORK REPORT ON THE SOFTWARE PROJECT 软件项目工作报告英语翻译

本文已影响 3.36W人 
WORK REPORT ON THE SOFTWARE PROJECT 软件项目工作报告英语翻译

WORK REPORT ON THE SOFTWARE PROJECT
软件项目工作报告英语翻译
  From:Dongqiang Huang, Head of Software Department
  To:Boss
  Ref:000001
  Date:September 1, 2011
The software project I am responsible for currently is the office automation project. The detail is as follow:
1. We have already completed the requirement investigation analysis and summary design, with detail design under way.
2. Each work goes with a swing. We estimate to complete the detail design on the 15th of this month. And then we can carry on software coding.
3. This project’s  time is very tight, Everyone is working overtime with all strength. We can finish our work on time.
Dongqiang Huang

猜你喜欢

热点阅读

最新文章

推荐阅读